RENOVATION WORK

Please be informed that COA will be undergoing flooring renovation work at the following areas:
1. Level 2 corridor outside lift lobby
2. Level 1 corridor outside Male toilet
3. Level 1 corridor outside Female toilet
4. Ramp at the drop-off point
5. Staircase at the front entrance
Duration: 18 November to 6 December
Please contact the COA office if you have any feedback during the renovation period.